Construction recycling, planned around your diversion target.
Tell us your target before the first container lands. We'll plan the material streams for the job, send each one to a facility that processes it, and keep the ticket for every load.

Where a load goes depends on what's in it.
Whether a load counts as recycled depends on the facility that receives it, so we choose the facility first and then send a container to match.
| Material | Where it goes | What comes back |
|---|---|---|
| Drywall | Back to the manufacturer, where clean scrap becomes new board | A line on your diversion report with a ticket behind it |
| Metal | A scrap recycler | The rebate, returned to you |
| Commingle | A facility that sorts mixed recyclables | The split by material, about a month after the haul |
| Concrete | Its own container, kept clean | A weight and a ticket, like every other load |
How a mixed load gets split by material.
Clean loads are the simple ones. When a container of scrap metal goes to a metal recycler, it's recycled and the whole weight counts.
Commingled loads take one more step, because the facility has to sort the load and report what it found. The breakdown here is a real load from one of our projects, as the facility reported it.
That split usually comes back about a month after the haul. Until it does, the load is pending, and the report says so.
How diversion is calculatedRecycling intensive projects are our bread and butter.
Every job runs in these four steps.
Plan the streams
We set the material streams against your recycling target, LEED or the owner's own goal, before the job starts.
Place the containers
We give each stream its own container, sized to the phase you're in.
Route each load
We send every haul to a facility that processes that material.
Keep the tickets
We weigh and ticket each load, and the ticket goes into your report.
Every haul we manage can count toward your diversion target.
We gather the scale tickets from every vendor, check each one against their bill and our service records, and sign the report before it reaches your owner.